Plant Expansion Project


Addison Project were commissioned by a our client to perform the role of principal contractor for the build of a new process plant on an existing Chemical plant in the North West of England.

Small Caption
Text explaining the image

The plant expansion was required to double plant capacity to 40,000 tpa. It involved working in close proximity with the existing live plant and performing necessary tie ins during the annual shutdowns. The project was delivered on time, in budget with no major accidents.

Our role as a principal contractor also included multi-discipline engineering support, including civil structural, mechanical and control electrical design which was completed in conjunction with our an appointed Swedish design partner. It also included project management and planning duties, procurement of all equipment and contracts and construction management, SHE Management and CDM co-ordination.

Project Highlights

  • All Civil works including foundations for new plant, raised bund for cooling tower and new roadway.
  • All Steel works including steel structure, pipe bridges, platforms for storage tanks.
  • 12,000 meters of pipework installed.
  • 180 pieces of main plant equipment including cooling tower and site built tanks.
  • 1500 manual valves specified and ordered.
  • 500 instruments specified and ordered.
  • Migration and expansion of existing Delta V system.

 

Contact


  • This field is for validation purposes and should be left unchanged.

General Enquiries:

enquiries@addisonproject.co.uk


Career Enquiries:

vacancies@addisonproject.co.uk


Project Enquiries:

Hillhouse: 01253 898 200

Daresbury Park: 01928 786 000

Teesside: 01642 694 000


Precision Enquiries:

T: 01253 898 292


Engineering Enquiries:

T: 01253 898 280


Regional Offices:

Hillhouse Business Park, Thornton Cleveleys, Lancs, FY5 4QD

Daresbury Park, Warrington, Cheshire, WA4 4BS

Riverside Park, Middlesbrough, Teesside, TS2 1RU


Find us on LinkedIn:

Project, Precision, Engineering.